Notice published 5 Mar 2025

Public Contracts Regulations 2015 notice

Building Decarbonisation Projects at Williamson Park, The Storey and City Lab

Lancaster City Council

Buyer
Lancaster City Council
Latest stage
tender
Latest notice
5 Mar 2025
Stated contract period
13 May 2025 to 30 Jan 2026
Award period
Not stated to Not stated
OCID
ocds-b5fd17-356f3831-60a5-45ab-bda1-eaf15876ade7
Procurement method
open
Official notice ↗

Held original notices: Contracts Finder to 9 November 2026. Find a Tender originals run from 24 February 2025 through 10 November 2026 exclusive, including the L1 gap package from 17 August 2026, with supplementary packages for part of 16 to 23 August 2026. The official notice may have changed. Check Contracts Finder search if it cannot be opened.

Which stages have a stated date?

4 of the six stages have a date on the held notices. A gap means no held notice states that date; it does not mean the stage did not happen.

  1. Planning noticeNo planning notice is held.
  2. Tender noticePublication date of the first held tender notice.
  3. Tender deadline
  4. Award dateNot stated on the held notice.
  5. Contract start
  6. Contract end

Source: held original Contracts Finder notices 44f642b4-6c55-4494-a046-f2df3b4aba95-831829, read offline: stage notices, tender period, awards and the stated contract period.

What the held notices state

Tender deadline
7 Apr 2025
Process status
Active
Regime
Not stated on the held notice
Procurement method
Open procedure (below threshold)
Stated reason for the method
Not stated on the held notice
Number of bids
Not stated on the held notice
Above the procurement threshold
Not stated on the held notice
Framework agreement
Not stated on the held notice
Marked suitable for small firms
Not stated on the held notice

Awards

Not stated on the held notice: no award is listed.

Lots

Not stated on the held notice: no lot is listed.

Options and renewal

Not stated on the held notice.

Source: held original Contracts Finder notices 44f642b4-6c55-4494-a046-f2df3b4aba95-831829, read offline. Each field shows what the latest held notice stating it says. Not stated means no held notice for this process states it. A size is shown only where the notice states it for that supplier.

Contract period

13 May 202530 Jan 2026

The bar is the stated lot or tender contract period. The mark, where it falls inside the period, is the export build date of 10 November 2026. Option and renewal wording is shown above where a held notice states it.

Notice description

Phase 1 Pre Construction Services (RIBA Stage 4) The initial appointment will be for the pre construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase. Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Phase 2 Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor's performance and the project's requirements. The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re tender for the construction works. The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations. Deliver the goods and or provide services/deliver the works at Williamson Park, Quernmore Road, Lancaster LA1 1UX; The Storey, 2 Meeting House Lane, Town Centre, Lancaster, LA1 1TH; City Lab 406 Dalton Square, Lancaster, LA1 1PP. The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on site activities, can commence until all planning permissions are secured. The timeline for the project may be ex

Contact removal rule: contacts/1.

Separate stated values

Estimate 1

£3,200,000

VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.

No ceiling or maximum amount is in this export. The official notice is the place to read one.

Held stage events

  1. : tender

Dates are the publication dates of the held stage notices. This is not a complete release history. The tender deadline is shown above where a held notice states it.

Suppliers

    This list gathers every supplier named on any held award. Each award and its suppliers are shown above. Names without an organisation identity remain withheld pending review.

    Categories

    Sources

    2025/02/25.csv.gz
    Publisher
    Cabinet Office
    SHA256
    430f19dfaf143bf0f1f7dbcb29f1fffd8ff652e0b2195642660063d03cc76810
    Licence
    http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/
    Retrieved
    Original retrieval time not recorded
    2025/03/05.csv.gz
    Publisher
    Cabinet Office
    SHA256
    685e7d5304ee28b24e626376dd7b5fdfd122efa9066d7f0e24fcd45fcac1fab1
    Licence
    http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/
    Retrieved
    Original retrieval time not recorded

    Coverage and the source register.

    What this export cannot show

    Award values are not linked to a named supplier, and no ceiling or maximum amount is shown. Those facts stay on the official notice when the notice publishes them. A tender deadline, award dates, supplier sizes, lots, and option or renewal wording appear on contract pages only where a held notice states them. A held process counts as last at tender or planning only when that is the latest stage among the held releases. Where more than one supplier is named, the names are joint and no share is stated.