Estimate 1
£100,000,000
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
Public Contracts Regulations 2015 notice
Held original notices: Contracts Finder to 9 November 2026. Find a Tender originals run from 24 February 2025 through 10 November 2026 exclusive, including the L1 gap package from 17 August 2026, with supplementary packages for part of 16 to 23 August 2026. The official notice may have changed. Check Contracts Finder search if it cannot be opened.
4 of the six stages have a date on the held notices. A gap means no held notice states that date; it does not mean the stage did not happen.
Source: held original Contracts Finder notices 5ddfda0a-4ce7-4851-a371-266b1b3af859-503199, read offline: stage notices, tender period, awards and the stated contract period.
Award. Status: Active. Award date: 12 Jan 2022.
Not stated on the held notice: no lot is listed.
Not stated on the held notice.
Source: held original Contracts Finder notices 5ddfda0a-4ce7-4851-a371-266b1b3af859-503199, read offline. Each field shows what the latest held notice stating it says. Not stated means no held notice for this process states it. A size is shown only where the notice states it for that supplier.
The bar is the stated lot or tender contract period. The mark, where it falls inside the period, is the export build date of 10 November 2026. Option and renewal wording is shown above where a held notice states it.
The Authority is seeking to appoint a single Contractor to act as consultant to assist with design and statutory procedure support (Phase 1) and to undertake the construction as the main Contractor of the highway infrastructure (Phase 2) for the Lancaster South Growth Catalyst project. The components of the infrastructure interventions included in the tender are: • Reconfiguration of M6 Junction 33 relocating the north facing slip roads 2 km northwards maintaining connectivity to the southern facing slip roads with a connector road parallel to the motorway. • A new highway connection from the vicinity of the new northern slip roads to the principal highway network A6 north of Galgate forming a bypass of the village for motorway bound traffic. • A 300m link under the West Coast Main Line to connect to the Bailrigg Garden Village site. • New 2km (approximately) spine road though the garden village site. • Link from spine road to A588 including canal bridge.
Contact removal rule: contacts/1.
£100,000,000
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
£100,000,000
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
No ceiling or maximum amount is in this export. The official notice is the place to read one.
Dates are the publication dates of the held stage notices. This is not a complete release history. The tender deadline is shown above where a held notice states it.
This list gathers every supplier named on any held award. Each award and its suppliers are shown above. Names without an organisation identity remain withheld pending review.
Award values are not linked to a named supplier, and no ceiling or maximum amount is shown. Those facts stay on the official notice when the notice publishes them. A tender deadline, award dates, supplier sizes, lots, and option or renewal wording appear on contract pages only where a held notice states them. A held process counts as last at tender or planning only when that is the latest stage among the held releases. Where more than one supplier is named, the names are joint and no share is stated.