Estimate 1
£2,200,000
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
Public Contracts Regulations 2015 notice
Held original notices: Contracts Finder to 9 November 2026. Find a Tender originals run from 24 February 2025 through 10 November 2026 exclusive, including the L1 gap package from 17 August 2026, with supplementary packages for part of 16 to 23 August 2026. The official notice may have changed. Check Contracts Finder search if it cannot be opened.
4 of the six stages have a date on the held notices. A gap means no held notice states that date; it does not mean the stage did not happen.
Source: held original Contracts Finder notices 9f76a8a2-30b3-4e8f-a1c0-83275dc3b260-849647, read offline: stage notices, tender period, awards and the stated contract period.
Award. Status: Active. Award date: 23 Apr 2025.
Not stated on the held notice: no lot is listed.
Not stated on the held notice.
Source: held original Contracts Finder notices 9f76a8a2-30b3-4e8f-a1c0-83275dc3b260-849647, read offline. Each field shows what the latest held notice stating it says. Not stated means no held notice for this process states it. A size is shown only where the notice states it for that supplier.
The bar is the stated lot or tender contract period. The mark, where it falls inside the period, is the export build date of 10 November 2026. Option and renewal wording is shown above where a held notice states it.
"Grimsargh Skew Bridge is a single span reinforced concrete structure which was previously strengthened in 2001. Currently, the width of the main bridge restricts traffic to a single lane width, restricting flow of vehicles. There are steel pedestrian footbridges on both sides (east & west) of the bridge. The eastern footbridge is relatively new and will be retained. A scheme has been developed to widen the structure to enable two way traffic for vehicles and therefore improve traffic flows. The works substantially consist of the demolition of the western footbridge, the widening of the existing main bridge and the installation of a signalised pedestrian crossing to the north of the bridge, adjacent to the nearby primary school. The design of both the temporary and permanent works required for the bridge widening is proposed to be designed by the contractor to match the fixed highways alignment designed by LCC. The full scope of this project is contained at ITT Appendix 5 and the associated contractual documents. Please ensure that you read all documentation in the preparation of your Tender and should you have any queries on the contents, please raise a clarification request in the manner described at paragraph 2.7 within the timescales outlined with paragraph 3.1." Additional information: "The full tender pack including the ITT document outlining requirements, the specification and terms and conditions can be downloaded from the LCC isupplier portal. Returns must be submitted via the portal."
Contact removal rule: contacts/1.
£2,200,000
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
£1,079,112
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
No ceiling or maximum amount is in this export. The official notice is the place to read one.
Dates are the publication dates of the held stage notices. This is not a complete release history. The tender deadline is shown above where a held notice states it.
This list gathers every supplier named on any held award. Each award and its suppliers are shown above. Names without an organisation identity remain withheld pending review.
Award values are not linked to a named supplier, and no ceiling or maximum amount is shown. Those facts stay on the official notice when the notice publishes them. A tender deadline, award dates, supplier sizes, lots, and option or renewal wording appear on contract pages only where a held notice states them. A held process counts as last at tender or planning only when that is the latest stage among the held releases. Where more than one supplier is named, the names are joint and no share is stated.