UK Public
Contracts
Saved 0

Notice published 7 Apr 2026

Public Contracts Regulations 2015 notice

Bispham To Cocker Square Coastal Protection Scheme Call off of SCAPE Civil Engineering Framework England, Wales and Northern Ireland

Blackpool Council

Buyer
Blackpool Council
Latest stage
award
Latest notice
7 Apr 2026
Stated contract period
16 Mar 2026 to 11 Jan 2030
Award period
16 Mar 2026 to 11 Jan 2030
OCID
ocds-b5fd17-f763246e-7587-4734-94b5-3163fcf7050a
Procurement method
selective
Official notice ↗

Held original notices: Contracts Finder to 9 November 2026. Find a Tender originals run from 24 February 2025 through 10 November 2026 exclusive, including the L1 gap package from 17 August 2026, with supplementary packages for part of 16 to 23 August 2026. The official notice may have changed. Check Contracts Finder search if it cannot be opened.

Which stages have a stated date?

4 of the six stages have a date on the held notices. A gap means no held notice states that date; it does not mean the stage did not happen.

  1. Planning noticeNo planning notice is held.
  2. Tender noticeNo tender notice is held.
  3. Tender deadline
  4. Award date
  5. Contract start
  6. Contract end

Source: held original Contracts Finder notices 70a8c5ec-8fef-4352-94d6-299499f48e4e-883092, read offline: stage notices, tender period, awards and the stated contract period.

What the held notices state

Tender deadline
1 Feb 2026
Process status
Complete
Regime
Not stated on the held notice
Procurement method
Call off from a framework agreement
Stated reason for the method
Not stated on the held notice
Number of bids
Not stated on the held notice
Above the procurement threshold
Not stated on the held notice
Framework agreement
Not stated on the held notice
Marked suitable for small firms
Not stated on the held notice

Awards

  • Award. Status: Active. Award date: 4 Feb 2026.

    • BALFOUR BEATTY CIVIL ENGINEERING (SW) LIMITED: Large

Lots

Not stated on the held notice: no lot is listed.

Options and renewal

Not stated on the held notice.

Source: held original Contracts Finder notices 70a8c5ec-8fef-4352-94d6-299499f48e4e-883092, read offline. Each field shows what the latest held notice stating it says. Not stated means no held notice for this process states it. A size is shown only where the notice states it for that supplier.

Contract period

16 Mar 202611 Jan 2030

The bar is the stated lot or tender contract period. The mark, where it falls inside the period, is the export build date of 10 November 2026. Option and renewal wording is shown above where a held notice states it.

Notice description

The works comprise a pre construction contract for the Little Bispham to Bispham & Gynn Square to Cocker Square Coast Protection Scheme (sections B1.2 & B1.4 of the Blackpool coastal frontage, respectively). The project comprises a series of Rock Headlands, with associated cross over access ramps, that are designed to stabilise or reverse the long term beach lowering trend at the toe of the existing defences. The works also include urgent repairs to the existing coastal defences (e.g. recasting/patch repairs to selected areas such as where there is exposed reinforcement or significant cracking). This will include recasting beach access steps where required for public safety and major improvements to the slipway at Little Bispham. The extent and details of the urgent revetment repairs, recasting access steps and slipway improvements will be developed and fully defined during the detailed design phase.

Contact removal rule: contacts/1.

Separate stated values

Estimate 1

£61,264,730

VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.

Award amount 2

£61,264,730

VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.

No ceiling or maximum amount is in this export. The official notice is the place to read one.

Held stage events

  1. : award

Dates are the publication dates of the held stage notices. This is not a complete release history. The tender deadline is shown above where a held notice states it.

Suppliers

This list gathers every supplier named on any held award. Each award and its suppliers are shown above. Names without an organisation identity remain withheld pending review.

Categories

Sources

2026/04/07.csv.gz
Publisher
Cabinet Office
SHA256
3a03cca273b187abb380b73ecd1532d06e315081fb9eea2ff326a94cf6e7d1a7
Licence
http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/
Retrieved
Original retrieval time not recorded

Coverage and the source register.

What this export cannot show

Award values are not linked to a named supplier, and no ceiling or maximum amount is shown. Those facts stay on the official notice when the notice publishes them. A tender deadline, award dates, supplier sizes, lots, and option or renewal wording appear on contract pages only where a held notice states them. A held process counts as last at tender or planning only when that is the latest stage among the held releases. Where more than one supplier is named, the names are joint and no share is stated.