Estimate 1
Not stated
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
Directive 2014/24/EU notice
Payments Transparency Register ↗. Search the register for OCID ocds-h6vhtk-04e7c4. The Payments Transparency Register publishes payments under public contracts commenced after 31 March 2026 that fall under Section 70 of the Procurement Act 2023. Contracting authorities must publish information about any payment of more than £30,000, including VAT. Values on the register exclude VAT. This site does not republish those payments.
Held original notices: Contracts Finder to 9 November 2026. Find a Tender originals run from 24 February 2025 through 10 November 2026 exclusive, including the L1 gap package from 17 August 2026, with supplementary packages for part of 16 to 23 August 2026. The official notice may have changed. Check Find a Tender search if it cannot be opened.
2 of the six stages have a date on the held notices. A gap means no held notice states that date; it does not mean the stage did not happen.
Source: held original Find a Tender notices 007149-2025, 037694-2025, read offline: stage notices, tender period, awards and the stated contract period.
Award 1 on notice 037694-2025. Status: Active. Award date: Not stated on the held notice. Lot 1.
| Lot | Title | Status | Contract period | Latest possible end |
|---|---|---|---|---|
| Lot 1 | Not stated on the held notice | Cancelled | Not stated on the held notice | Not stated on the held notice |
Source: held original Find a Tender notices 007149-2025, 037694-2025, read offline. Each field shows what the latest held notice stating it says. Not stated means no held notice for this process states it. A size is shown only where the notice states it for that supplier.
No contract period with a start and a later end is stated. Option and renewal wording is shown above where a held notice states it.
Phase 1 Pre Construction Services (RIBA Stage 4) The initial appointment will be for the pre construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase. Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Page 4 to 10 Phase 2 Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor’s performance and the project’s requirements. The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re tender for the construction works. The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations. The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on site activities, can commence until all planning permissions are secured. The timeline for the project may be extended if planning approvals are delayed. Coordination with external parties, may also impact the timing of planning approvals and should be factored into the project delivery plan. The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS), and the key funding condition is that the project must be fully delivered, reach Practical Completion (PC), and be signed off by the end of January 2026. This is the final deadline for the project, and all works must be completed, tested, commissioned, and handed over before this date to ensure compliance with funding requirements. While an initial target of December 2025 has been identified for completion, this is flexible to avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure quality and performance, rather than rush delivery.
Contact removal rule: contacts/1.
Not stated
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
Not stated
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
No ceiling or maximum amount is in this export. The official notice is the place to read one.
Dates are the publication dates of the held stage notices. This is not a complete release history. The tender deadline is shown above where a held notice states it.
This list gathers every supplier named on any held award. Each award and its suppliers are shown above. Names without an organisation identity remain withheld pending review.
Award values are not linked to a named supplier, and no ceiling or maximum amount is shown. Those facts stay on the official notice when the notice publishes them. A tender deadline, award dates, supplier sizes, lots, and option or renewal wording appear on contract pages only where a held notice states them. A held process counts as last at tender or planning only when that is the latest stage among the held releases. Where more than one supplier is named, the names are joint and no share is stated.