Estimate 1
£1,800,000
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
Procurement Act 2023 notice
Payments Transparency Register ↗. Search the register for OCID ocds-h6vhtk-05db61. The Payments Transparency Register publishes payments under public contracts commenced after 31 March 2026 that fall under Section 70 of the Procurement Act 2023. Contracting authorities must publish information about any payment of more than £30,000, including VAT. Values on the register exclude VAT. This site does not republish those payments.
Held original notices: Contracts Finder to 9 November 2026. Find a Tender originals run from 24 February 2025 through 10 November 2026 exclusive, including the L1 gap package from 17 August 2026, with supplementary packages for part of 16 to 23 August 2026. The official notice may have changed. Check Find a Tender search if it cannot be opened.
3 of the six stages have a date on the held notices. A gap means no held notice states that date; it does not mean the stage did not happen.
Source: held original Find a Tender notices 071418-2025, read offline: stage notices, tender period, awards and the stated contract period.
Not stated on the held notice: no award is listed.
| Lot | Title | Status | Contract period | Latest possible end |
|---|---|---|---|---|
| Lot 1 | Not stated on the held notice | Planned | 1 Apr 2026 to 31 Mar 2028 | 31 Mar 2030 |
Source: held original Find a Tender notices 071418-2025, read offline. Each field shows what the latest held notice stating it says. Not stated means no held notice for this process states it. A size is shown only where the notice states it for that supplier.
The bar is the stated lot or tender contract period. The mark, where it falls inside the period, is the export build date of 10 November 2026. Option and renewal wording is shown above where a held notice states it.
The Authority has a requirement to enter into a contract to provide specialised road surfacing system services. The service requirement is for planned work and will consist of the supply of specialist surfacing materials and fitting. The scope of the services will cover the county of Lancashire. The contracted provision will be required to provide a surface system that uses BBA HAPAS approved materials. These must be designed for use on heavily trafficked roads, trunk roads, industrial estates, bus lanes, and urban areas where exceptional resistance to deformation, fuel resistance, and durability are essential. The surfacing system solution is a specially designed open graded bituminous macadam matrix that is followed with the application of a proprietary two part epoxy or polyurethane based cementitious grout, designed to fully penetrate and cure within the macadam structure. The finished result is high skid resistance, exceptional resistance to deformation, fuel resistance, and durability. A minimum of 5 year guarantee is required for any material / solution that is proposed during the tender process and assurance must be provided that the surface will neither disintegrate nor require repairs during the 5 year period. There will be one contractor appointed for this contract. The commencement date of the Contract will be 1st April 2026.
Contact removal rule: contacts/1.
£1,800,000
VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.
No ceiling or maximum amount is in this export. The official notice is the place to read one.
Dates are the publication dates of the held stage notices. This is not a complete release history. The tender deadline is shown above where a held notice states it.
This list gathers every supplier named on any held award. Each award and its suppliers are shown above. Names without an organisation identity remain withheld pending review.
Award values are not linked to a named supplier, and no ceiling or maximum amount is shown. Those facts stay on the official notice when the notice publishes them. A tender deadline, award dates, supplier sizes, lots, and option or renewal wording appear on contract pages only where a held notice states them. A held process counts as last at tender or planning only when that is the latest stage among the held releases. Where more than one supplier is named, the names are joint and no share is stated.