UK Public
Contracts
Saved 0

Notice published 2 Sep 2026

Procurement Act 2023 notice

Highways Framework

Blackpool Council

Buyer
Blackpool Council
Latest stage
contract
Latest notice
2 Sept 2026
Stated contract period
Not stated to Not stated
Award period
1 Oct 2026 to 30 Sept 2030
OCID
ocds-h6vhtk-05f433
Procurement method
open
Official notice ↗

Payments Transparency Register ↗. Search the register for OCID ocds-h6vhtk-05f433. The Payments Transparency Register publishes payments under public contracts commenced after 31 March 2026 that fall under Section 70 of the Procurement Act 2023. Contracting authorities must publish information about any payment of more than £30,000, including VAT. Values on the register exclude VAT. This site does not republish those payments.

Held original notices: Contracts Finder to 9 November 2026. Find a Tender originals run from 24 February 2025 through 10 November 2026 exclusive, including the L1 gap package from 17 August 2026, with supplementary packages for part of 16 to 23 August 2026. The official notice may have changed. Check Find a Tender search if it cannot be opened.

Which stages have a stated date?

3 of the six stages have a date on the held notices. A gap means no held notice states that date; it does not mean the stage did not happen.

  1. Planning noticeNo planning notice is held.
  2. Tender noticePublication date of the first held tender notice.
  3. Tender deadline
  4. Award date
  5. Contract startNot stated on the held notice.
  6. Contract endNot stated on the held notice.

Source: held original Find a Tender notices 001320-2026, 082951-2026, read offline: stage notices, tender period, awards and the stated contract period.

What the held notices state

Tender deadline
9 Feb 2026
Process status
Complete
Regime
Procurement Act 2023, stated as UKPGA 2023/54
Procurement method
Open procedure
Stated reason for the method
Not stated on the held notice
Number of bids
Lot 1: 17; Lot 2: 18
Above the procurement threshold
Yes
Framework agreement
Yes

Up to 4 tenderers will be awarded a place on each lot of the framework. Tenderers may apply for one or both lots. The call off and selection procedure is set out within the Framework Information provided with the tender information and is available on Blackpool Council's e tendering portal The published framework information sets out the selection procedure to decide which of the suppliers will be instructed to submit a quotation for a work order and a quotation procedure for obtaining a quotation from a Supplier. Quotations may be obtained either by requesting a quotation without secondary competition in which a Supplier is instructed to submit a quotation for the work in a Work Order or by requesting quotations with secondary competition in which more than one supplier is instructed to submit a quotation for the work in a work order.

Marked suitable for small firms
Not stated on the held notice

Awards

  • Award 1 of 2. Status: Active. Award date: 2 Sept 2026. Lot 1.

    • ASSOCIATED ASPHALT CONTRACTING LTD: Large
    • MULTIPAVE (NW) LIMITED: Small or medium enterprise
    • DSD CONSTRUCTION LIMITED: Small or medium enterprise
    • J. HOPKINS (CONTRACTORS) LIMITED: Small or medium enterprise
  • Award 2 of 2. Status: Active. Award date: 2 Sept 2026. Lot 2.

    • ASSOCIATED ASPHALT CONTRACTING LTD: Large
    • GEORGE COX & SONS LIMITED: Small or medium enterprise
    • P. CASEY (LAND RECLAMATION) LIMITED: Small or medium enterprise
    • A E YATES LIMITED: Small or medium enterprise

Suppliers named together on one award are joint. No share is stated.

Lots

Source: held Find a Tender notices 001320-2026, 082951-2026.
LotTitleStatusContract periodLatest possible end
Lot 1Not stated on the held noticeCompleteNot stated on the held noticeNot stated on the held notice
Lot 2Not stated on the held noticeCompleteNot stated on the held noticeNot stated on the held notice

Options and renewal

Not stated on the held notice.

Source: held original Find a Tender notices 001320-2026, 082951-2026, read offline. Each field shows what the latest held notice stating it says. Not stated means no held notice for this process states it. A size is shown only where the notice states it for that supplier.

Contract period

No contract period with a start and a later end is stated. Option and renewal wording is shown above where a held notice states it.

Notice description

Blackpool Council are establishing a lotted Highways surfacing and highways civil engineering works framework. The framework will enable call off contracts to be entered into in the manner described within the tender documents. The framework will consist of two lots: Lot 1 Highways Surfacing re surfacing and re construction of the highway network using conventional surfacing materials consisting of flexible and rigid pavement treatments (hot, warm and cold mix asphalts/concrete) and associated works such as, but not limited to road markings and signs, kerbs, drainages, barriers etc. Lot 2 Highways Civils Civil Engineering Works includes construction of improvement works on or associated with the highway network that may include the following; Earthworks excavation, embankment construction, soil stabilisation, ground improvement, Drainage works installation and renewal of surface water and foul water drainage systems, gullies, manholes, culverts, soakaways, attenuation features, Structures construction, maintenance, and strengthening of highway related structures such as retaining walls, culverts, small bridges, underpasses, Kerbing and footways new construction and reconstruction of kerbs, footways, cycleways, pedestrian crossings, and paved areas, Carriageway construction full depth reconstruction, junction realignments, new road construction (excluding surfacing only works covered under Lot 1), Traffic management and safety features installation of safety barriers, guardrails, traffic islands, bollards, street lighting foundations, Environmental and landscaping works reinstatement of verges, topsoiling, seeding, planting, and other mitigation measures linked to highway improvements, Utility works interface coordination of civil works around statutory undertakers' Apparatus and chambers The framework will consist of up to 4 Suppliers for lot 1 and up to 4 Suppliers for lot 2 in line with the tender documents. The indicative range of call off contracts that may be entered into is typically expected to be in the range as set out below: • Lot 1 Highways Surfacing £100,000 £5,000,000 • Lot 2 Highways Civils £100,000 £1,500,000 The mechanism for awarding contracts from the framework is set out in the published framework information which details a selection procedure to decide which of the suppliers will be instructed to submit a quotation for a work order and a quotation procedure for obtaining a quotation from a Supplier. Quotations may be obtained either by requesting a quotation without secondary competition in which a Supplier is instructed to submit a quotation for the work in a Work Order or by requesting quotations with secondary competition in which more than one supplier is instructed to submit a quotation for the work in a work order. The Contracting Authority is Blackpool Council. In addition to the Contracting Authority the framework will be made available to Lancashire County Council, Blackburn with Darwen Council, Lancashire Combined County Authority and all current and future members and associate members of the Association of Greater Manchester Authorities (AGMA). The current members of AGMA are: Bolton Council, Bury Council, Manchester City Council, Oldham Metropolitan Borough Council, Rochdale Council, Salford City Council, Stockport Metropolitan Borough Council, Tameside Council, Trafford Council and Wigan Council. The Associate Members of AGMA are: Blackburn with Darwen Council, Blackpool Council, Cheshire East and Warrington Borough Council plus Transport for Greater Manchester, Greater Manchester Fire and Rescue Service Greater Manchester Police and Greater Manchester Waste Disposal Authority.

Contact removal rule: contacts/1.

Separate stated values

Estimate 1

Not stated

VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.

Award amount 2

£120,000,000

VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.

Award amount 3

£80,000,000

VAT basis unknown. No amounts are added together or allocated to individual suppliers. This is not a payment.

No ceiling or maximum amount is in this export. The official notice is the place to read one.

Held stage events

  1. : tender
  2. : amendment
  3. : award
  4. : contract

Dates are the publication dates of the held stage notices. This is not a complete release history. The tender deadline is shown above where a held notice states it.

Suppliers

These names are joint. No share is stated.

This list gathers every supplier named on any held award. Each award and its suppliers are shown above. Names without an organisation identity remain withheld pending review.

Sources

fts_raw_2025-12-01_2026-01-01.json.gz
Publisher
Find a Tender
SHA256
b0ffdc2b04293bb3f367576421f872ce2815d3bf5711c70fc2df4fd7207dc010
Licence
Not recorded in held file
Retrieved
Original retrieval time not recorded
fts_raw_2026-01-01_2026-02-01.json.gz
Publisher
Find a Tender
SHA256
373636ae3d46131107bbab0670261ce55cf95a62315ba5ea9b015348bb1dce80
Licence
Not recorded in held file
Retrieved
Original retrieval time not recorded
fts_raw_2026-08-17_2026-11-10.json.gz
Publisher
Find a Tender
SHA256
e440b715e822504d52e0e83674d9774cfd873b24825ca0a7abde984ba5682102
Licence
Not recorded in held file
Retrieved
Original retrieval time not recorded
Official notice 082951-2026
Publisher
Find a Tender
SHA256
efe24e3a085cecf8233d4510c5e087772117d1a9baa427894380bf1d45183ee8
Licence
See held source file
Retrieved
Original retrieval time not recorded

Coverage and the source register.

What this export cannot show

Award values are not linked to a named supplier, and no ceiling or maximum amount is shown. Those facts stay on the official notice when the notice publishes them. A tender deadline, award dates, supplier sizes, lots, and option or renewal wording appear on contract pages only where a held notice states them. A held process counts as last at tender or planning only when that is the latest stage among the held releases. Where more than one supplier is named, the names are joint and no share is stated.